Beach management
Groynes in coastal engineering (CIRIA C793), published by CIRIA in 2020, defines Beach management as: ‘The process of managing a beach, whether by monitoring, simple intervention, recycling, nourishment, the construction or maintenance of beach control structures or by some combination of these techniques in a way that reflects an acceptable compromise in the light of available finance, between the various coastal defence, nature conservation, public amenity and industrial objectives.
It suggests a beach management plan: ‘…provides a basis for the management of a beach for coastal defence purposes, taking into account coastal processes and the other uses of the beach. Beach manager.’
And a beach manager as someone that: ‘…seeks to manage or operate a beach as a natural/recreational resource, or as a means of coastal defence, while providing facilities that meet the needs and aspirations of those who use the beach.’
[edit] Related articles on Designing Buildings Wiki
- Beach.
- Berm.
- Caisson.
- Coastal change management area.
- Delta Works sea defences.
- Difference between cofferdams and caissons.
- Dredging.
- Flood defences.
- Future of seaside towns.
- Groynes
- Land-sea interface.
- Planning for floods.
- Seashaken Houses: A lighthouse history from Eddystone to Fastnet.
- Temporary flood defences.
Featured articles and news
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.